Thought I would take a few weeks off and finish off my rolling chassis however it has been too hot to do anything. Last 2 days were 38 degrees Celsius and the forecast for today is also 38 degrees. It was 35.4 at 10:00am this morning and the next few days even hotter.
Friday, 28 December 2012
Man its hot
Sunday, 9 December 2012
Satin Black Tank & Fender + Speedo
Painted my tank and front fender satin black on the weekend and fitted up my Drag Specialities speedo.
Saturday, 1 December 2012
Brake caliper mock-up
Fitted up a 2-Piston Performance Machine caliper. Just needed to fit a few spacers behind the brake disc to give the caliper some clearance on the back so it was clear of the spokes. Off to get some proper spacers machined up for it now rather than the flat washers I used for the trial fit up.
Sunday, 25 November 2012
Sunday, 18 November 2012
Sunday, 4 November 2012
More smoothing out the welds
Decided to smooth out all the welds on my Springer as wanted to go for a real old school look.
Before
After a few hours with round file, all done.
Before
After a few hours with round file, all done.
Thursday, 25 October 2012
Springer has arrived
All the way from the good old USA, a custom made springer for my build with a brass upgrade.
Fitted up perfectly (sorry about the crappy picture...too much sunshine)
Big thanks to Chad Pearson from Pearson Customs, sent him all my measurements and fitted up perfectly. Check out his website at www.pearsoncustoms.com
Fitted up perfectly (sorry about the crappy picture...too much sunshine)
Big thanks to Chad Pearson from Pearson Customs, sent him all my measurements and fitted up perfectly. Check out his website at www.pearsoncustoms.com
Sunday, 21 October 2012
Saturday, 13 October 2012
Sunday, 19 August 2012
Flywheel assembly all done
New Jims pinion and sprocket shafts fitted, new bearings and thrust washers, S&S Heavy Duty Rod Kit, balanced and trued.
Thursday, 2 August 2012
ebay parts arrived
Friday, 6 July 2012
Front wheel all done
Front bearings replaced, rim and spokes powder coated black, brass spoke nipples, home(shed) made truing stand, trued axially and radially.
Here's a tip I learnt from someone about making it easier to install your tyre on the rim. Place your tube in your tyre, inflate it and leave it like this for awhile. Remove the tube and install the tyre on the rim. The tube helps expand the tyre a bit which makes it easier to install.
All done.
Here's a tip I learnt from someone about making it easier to install your tyre on the rim. Place your tube in your tyre, inflate it and leave it like this for awhile. Remove the tube and install the tyre on the rim. The tube helps expand the tyre a bit which makes it easier to install.
All done.
Saturday, 23 June 2012
Rear brakes all set-up
Still been waiting for some parts, so knocked up a new brake rod (out of brass of course) and adjusted my rear brakes up.
Saturday, 16 June 2012
Not much happenning....waiting for parts
Waiting on a few parts before I can do much more:
- Thrust washers on order so I can complete the engine re-build
- Springer front end on order so I can finish the front end
- Front wheel bearings on order so I can finish the front wheel re-build
Decided to do a couple of small jobs:
- Fitted a Gorilla alarm
- Fitted up the kickstand (found some black hose...MADE IN USA)
Saturday, 9 June 2012
Best way to get rid of chrome
Way too shiny |
I am trying to have no chrome showing on my bike and a few guys on the XL Forum suggsted the following ways to get rid of chrome:
1. Take the parts to a chrome plating company and they'll strip them in the
chroming bath by reversing the polarity.
2. Leave it parked in the hood overnite...
3. Donate it to the poorest guy on the forum...
4. Use salt spray on the chrome
5. Scotchbrite pad over the whole thing and the paint
I have been using the following process and it has worked well so far on a lot chrome items, such as bolts, caps, brackets:
Step 1 - Buff with a Scotchbrite pad (medium) as this get rids of the shine and creates a profile
Step 2 - Clean with some metho
Step 3 - Paint with an etch primer (3 light coats...1 hour in between coats)
Step 4 - Paint with satin black acrylic (3 light coats...10-15 minutes between coats)
Etch Primer Coat |
All finished |
I am going to add a short piece of black hydraulic hose over the bottom of the leg to protect the paint when the kickstand is down and also my frame when the kickstand is up.
Friday, 8 June 2012
Kustomtech hand controls
Did a bit of custom work to my Kustomtech hand controls, dulled down the brass so it has a satin finish and also painted all the aluminium satin black.
Tuesday, 5 June 2012
Oil tank fitted plus a few other items
Painted my oil tank, added some pinstriping and brass fitting plus a few other items:
- Oil filter
- Solo bag
- and a brass hammer
Monday, 4 June 2012
Sunday, 3 June 2012
How to remove front wheel bearing outer races
Was trying to change out the front wheel bearings and the outer races were stuck hard. Couldn't tap them out from the back and didn't have a suitable puller.
Friday, 1 June 2012
Sunday, 27 May 2012
Subscribe to:
Posts (Atom)